Fiber optics that has been improperly placed is susceptible to damage. In order to enhance handling and good performance, it is imperative that some procedures and guidelines be followed in the connection of these cables to prevent damage and limiting their usefulness. This article, therefore, takes you through the pertinent issues and facts during fibre optic cable installation.
To begin with, ensure to conduct a site survey. A site survey is simply a preliminary visit of the site in order to have insights on the nature of the work to be undertaken. The survey enables you to come up with probable challenges and providing the solutions thereof. During the survey, the site is analyzed for areas demanding special concern while making estimates of the effort and time needed to carry out the duty. This information is particularly important in planning for cable routing.
The second step is to plan for the cable pulling. The plan incorporates the findings made in the survey stage and serves as a communication tool for the connection team on the considerations noted. It integrates the logistics of pulling equipment, splice locations and the locations of intermediate access points. Also, it is important to detail the particular duties and responsibilities of every individual member in the fixation team.
When undertaking the exercise, it is vital to follow the required procedure. Due to their delicate nature when exposed to moisture, the end of the cables must be insulated by an end cap at all times. The process of pulling should not be done when the left-off reel is unattended to since center-pulls, back-feeding and difficult pull techniques may be applied.
During the exercise, be sure not to exceed the minimum bend radius. Remember that every wire poses a minimum installation bend radius value. When placing them, it is important not to bend the cables to a smaller radius. On installing and after removing the pulling tension, they may only be bent to a radius not smaller than the specified long term application length of the radius. Coiling and wrapping is allowed as long as it does not violate the constraints of minimum bend radius.
Just like the minimum radius, there is also a constraint on the maximum length. Fiber optic comes stronger than copper, however, the length of the optic connector must be maintained lower than the maximum recommended length during all phases of installation. The average strength ratings of many connectors stand at 2700 N.
Apart from the cable length, there is also the uppermost load value recommended in the long run. As such, the resultant tension after the placement should be less than this value. When installing vertically, be keen to clamp the wires at consistent intervals in order to avoid the resulting weight from exceeding the specified long-term load. Nevertheless, the intervals between clamps must be enough to prevent movement and support the weight.
Ensure to document each phase of fixation. Documentation of the same provides a record for future reference and maintenance. The task of documentation should be done systematically to enhance flow and order. When in need of whatever type of connection, remember to check out on the above points.
To begin with, ensure to conduct a site survey. A site survey is simply a preliminary visit of the site in order to have insights on the nature of the work to be undertaken. The survey enables you to come up with probable challenges and providing the solutions thereof. During the survey, the site is analyzed for areas demanding special concern while making estimates of the effort and time needed to carry out the duty. This information is particularly important in planning for cable routing.
The second step is to plan for the cable pulling. The plan incorporates the findings made in the survey stage and serves as a communication tool for the connection team on the considerations noted. It integrates the logistics of pulling equipment, splice locations and the locations of intermediate access points. Also, it is important to detail the particular duties and responsibilities of every individual member in the fixation team.
When undertaking the exercise, it is vital to follow the required procedure. Due to their delicate nature when exposed to moisture, the end of the cables must be insulated by an end cap at all times. The process of pulling should not be done when the left-off reel is unattended to since center-pulls, back-feeding and difficult pull techniques may be applied.
During the exercise, be sure not to exceed the minimum bend radius. Remember that every wire poses a minimum installation bend radius value. When placing them, it is important not to bend the cables to a smaller radius. On installing and after removing the pulling tension, they may only be bent to a radius not smaller than the specified long term application length of the radius. Coiling and wrapping is allowed as long as it does not violate the constraints of minimum bend radius.
Just like the minimum radius, there is also a constraint on the maximum length. Fiber optic comes stronger than copper, however, the length of the optic connector must be maintained lower than the maximum recommended length during all phases of installation. The average strength ratings of many connectors stand at 2700 N.
Apart from the cable length, there is also the uppermost load value recommended in the long run. As such, the resultant tension after the placement should be less than this value. When installing vertically, be keen to clamp the wires at consistent intervals in order to avoid the resulting weight from exceeding the specified long-term load. Nevertheless, the intervals between clamps must be enough to prevent movement and support the weight.
Ensure to document each phase of fixation. Documentation of the same provides a record for future reference and maintenance. The task of documentation should be done systematically to enhance flow and order. When in need of whatever type of connection, remember to check out on the above points.